{"id":16689,"date":"2011-07-08T09:30:39","date_gmt":"2011-07-08T14:30:39","guid":{"rendered":"https:\/\/setsail.com\/?p=16689"},"modified":"2011-07-08T09:30:44","modified_gmt":"2011-07-08T14:30:44","slug":"fpb-64-5-and-6-progress","status":"publish","type":"post","link":"https:\/\/setsail.com\/fpb-64-5-and-6-progress\/","title":{"rendered":"FPB 64 #5 and #6 Progress"},"content":{"rendered":"
<\/p>\n
Progress continues in New Zealand on FPB 64s # five and six, with five being fully plated now.<\/p>\n
<\/p>\n
<\/p>\n
This photo from several weeks ago show six coming along nicely.<\/p>\n
<\/p>\n
We have mentioned the efficiency of series builds in the past – it is the only way we can get the cost down on such a high quality build – and the next few photos give you a glimpse \u00a0of how this works. For starters, there are welding jigs for various components, here showing the flying bridge area.<\/p>\n
<\/p>\n
Plated, fairing plates tacked welded in place, and seam welding under way.<\/p>\n
<\/p>\n
Almost ready to install.<\/p>\n
<\/p>\n
Meanwhile, the coaming and window mullions on five are ready for their roof\/flying bridge assembly to drop in place.<\/p>\n
<\/p>\n
Details, like this sealable Dorade vent down pipe, are costly to execute, and in the aggregate add up t o a considerable sum. They also add to the pleasure of ownership, not to mention keeping the interior dry in heavy weather.<\/p>\n
<\/p>\n
Doing a series allows Circa to produce large quantities at \u00a0one time.<\/p>\n
<\/p>\n
The castings (on top) will become the cover plates within the coaming.<\/p>\n
<\/p>\n
Various parts of the control mechanisms.<\/p>\n
<\/p>\n
And a look inside a completed Dorade down pipe assembly.<\/p>\n
<\/p>\n
A sonar tube assembly, ready to be welded into the forepeak.<\/p>\n
<\/p>\n
And finally a couple of shots of the carpentry shop.<\/p>\n
<\/p>\n
New Zealand is known for the skill of its chippies, and Circa has some of the best in the land.<\/p>\n","protected":false},"excerpt":{"rendered":"
Progress continues in New Zealand on FPB 64s # five and six, with five being fully plated now.<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50],"tags":[],"class_list":["post-16689","post","type-post","status-publish","format-standard","hentry","category-fpb-64-updates"],"_links":{"self":[{"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/posts\/16689"}],"collection":[{"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/comments?post=16689"}],"version-history":[{"count":0,"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/posts\/16689\/revisions"}],"wp:attachment":[{"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/media?parent=16689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/categories?post=16689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/setsail.com\/wp-json\/wp\/v2\/tags?post=16689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}