{"id":32888,"date":"2015-01-20T08:07:36","date_gmt":"2015-01-20T13:07:36","guid":{"rendered":"https:\/\/setsail.com\/?p=32888"},"modified":"2016-09-16T14:42:57","modified_gmt":"2016-09-16T19:42:57","slug":"fpb-78-1-moving-day","status":"publish","type":"post","link":"https:\/\/setsail.com\/fpb-78-1-moving-day\/","title":{"rendered":"FPB 78-1 Moving Day"},"content":{"rendered":"
<\/p>\n
It is moving day for FPB 78-1. She is on passage to the fit out hall as welding has been completed, and this space is required for the third FPB 78 to begin its journey.<\/p>\n
<\/p>\n
Here is a shot in the metalwork hall from the inside looking out. FPB 78-1 on the left, FPB78-2 to the right, and FPB64-11 in-between.<\/p>\n
<\/p>\n
This is a short passage, just a couple of boat lengths. Longer journeys await in a year.<\/p>\n
<\/p>\n
FPB 78-1 moving into her new digs.<\/p>\n
<\/p>\n
In a few days, interior installation begins.<\/p>\n
<\/p>\n
Almost there.<\/p>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"